Removing asbestos from the light wells of a Grade I Listed Building in West Yorkshire

BLS Asbestos Ltd were contracted to remove all asbestos containing materials from the former light wells in this Grade I listed building in West Yorkshire in early 2017. Following the completion of these works, the new owners were able to begin the renovation and conversion of the building for its future use, so that it will last for generations to come.

In its glory days the site was home to an impressive ballroom/cinema, banking hall and luxurious shops. It still remains an impressive building for its past and future use of bringing people together with a common goal of supporting local people.

"BLS Asbestos provide a professional and quality service enabling Hanover to deal with issues arising from the management of asbestos in compliance with the Control of Asbestos Regulations 2006."

Asbestos Removal from Social Housing for Hanover Housing

The Works

The works consisted of:

The removal and disposal of asbestos debris from the external light wells. The works were carried out under controlled conditions without the need for an enclosure due to very low anticipated fibre release. An independent UKAS accredited analyst was appointed to carry out background air testing during the course of the works.

The first part of the works were to seal up all openings between the basement and light wells. This was carried out from within the basement using timbers, polythene, tape and glue. Once this was complete, we made the light wells safe by collapsing in all the loose lying debris and scraping back all loose coping stones and waste material/rubble. Ground workers assisted us with this process with a qualified plant operator using an excavator.

All work areas were segregated from other site personnel using physical barriers and asbestos warning signage.

Site Safety

The BLS Site Supervisor carried out inspections of all plant, equipment and the enclosure / work area twice a day. In addition, all operatives and supervisors inspected their own RPE on a daily basis. All existing live services were isolated during our works.

Safe access scaffolding was provided by our client along with a ladder down into each light well.

A winch was also provided for lifting any large items and bags of waste out from the light wells. Some sharps (needles) were previously identified and removed accordingly. Our operatives were very vigilant during these works and scanned the work area on a daily basis.

Documentation & Compliance

ASB5 Notification of Work documentation was produced and issued to the Health and Safety Executive for works to the former lightwells.

The site file was kept up-to-date throughout the contract period and issued to the site supervisor. All analytical certificates of reoccupation and consignment notes are held on file.

All site works were audited (unannounced visits) by our HSQE Manager during the contract duration to confirm full compliance.

Other Case Studies

Asbestos Removal for David Brown Gears in Huddersfield

BLS Asbestos successfully completed the removal of asbestos-containing materials at the David Brown Gears manufacturing site in Huddersfield to facilitate the refurbishment for a new wind turbine gear facility.

Asbestos Removal at Grade 1 Listed Building in West Yorkshire

BLS Asbestos Ltd successfully removed asbestos from the light wells of a Grade I listed building in West Yorkshire, enabling its renovation for future use while ensuring compliance with safety regulations.

Asbestos Removal from Hopwood Hall College, Rochdale

The case study details the successful asbestos removal project at Hopwood Hall College in Rochdale, which was essential for repairing flood-damaged areas and ensuring the safe reopening of the college's IT and childcare departments.

Asbestos Removal from Leeds City College’s Technology Campus

BLS Asbestos Ltd successfully completed the removal of asbestos from the basement of Leeds City College's Technology Campus on a tight deadline, ensuring minimal disruption to the college's operations.

Asbestos Removal at Leeds Demolition Site

BLS Asbestos successfully removed and disposed of various asbestos-containing materials from a disused property in Leeds, ensuring the site was safe for demolition and future regeneration.

Asbestos Removal at Leeds Junior School

BLS Asbestos successfully removed asbestos insulating board from Yeadon Westfield Junior School's caretaker's residence to facilitate the construction of a new classroom, ensuring safety during the process by scheduling the work over the Easter break.

Asbestos Removal at Major Construction Company in Warrington

BLS Asbestos Limited successfully removed and disposed of over 221 tonnes of asbestos from multiple premises for a major construction company in Warrington, contributing to a development project that will create 400 new jobs in the region.

Asbestos Removal from Nestle’s Halifax Site

The case study details the successful removal of asbestos from Nestle's Halifax office building to facilitate a security relocation project, emphasizing health and safety throughout the process.

Asbestos Removal for the Reserve Forces’ and Cadets’ Association

BLS Asbestos Ltd successfully removed asbestos-containing materials from the boiler room of the Territorial Army Centre in Scunthorpe, ensuring safe operations for maintenance.

Asbestos Removal for Southampton Retail Fit-Out

BLS Asbestos was instructed by Sports Direct to remove all asbestos containing materials from a former BHS site in Southampton.

Asbestos Removal from The Old Vinyl Factory in Hayes

BLS Asbestos was commissioned to remove asbestos containing pipe insulation from the sub-floor ducts within the Old Vinyl Factory.

Asbestos Removal Contract for West Yorkshire School

BLS Asbestos undertook asbestos removal work in the riser, boiler room and undercroft area of a West Yorkshire High School.