Case Study: Asbestos Removal at Leeds Demolition Site

Location: Leeds, West Yorkshire           Services Used: Asbestos Removal

Get In Touch

Licensed and non-licensable asbestos removal work to make a Leeds demolition site safe for workers

BLS Asbestos was successful in tendering and securing works to remove all existing asbestos containing materials from a disused property in the Tinshill area of Leeds, West Yorkshire, which had been earmarked for demolition.

The property was used as a mixed gender learning centre which opened over 20 years ago. When demolished the site would lead to regeneration for the local area.

The works consisted of

The BLS team undertook a range of licensable works at the Leeds site, including the removal and disposal of:

AIB to columns

AIB up stands to windows

Internal soffit panels

AIB ceilings

AIB to walk-in fridge

AIB packers

In total, our qualified workers removed approximately 500 linear metres of columns, window reveals, soffits and packers, along with 200 square metres of ceiling panels and panels to walk-in fridge.

In addition, our team completed the removal and disposal of:

AIB firebreak panels and column panelling within the boiler house and the 2 small electric rooms

Asbestos rope around the flue pipe/ducting which was removed as part of these works

This amounted to the removal of a further 15 linear metres of asbestos containing materials.

All these works were carried out under fully controlled conditions using 2 enclosures subject to negative pressure. Upon completion of the works, an independent UKAS-accredited analyst was appointed to carry out 4 stage clearances.

ASB5 notifications were prepared and issued to the HSE for each site location.

The project also involved BLS undertaking the removal and disposal of various non-licensable asbestos items, including:

Seal to external wall of boiler house

Toilet cisterns

Sink pads

The works were carried out under controlled conditions without an enclosure.

All risks were assessed and reduced/avoided by means of individual site specific risk assessments and suitable method statements were prepared for each work location.

A UKAS accredited analytical consultancy was appointed to carry out independent clearances of our work areas and provide certificates of reoccupation to our client so demolition works could commence safely.

All asbestos removal works were safely managed and completed within the agreed programme.

Other Case Studies

Asbestos Removal for David Brown Gears in Huddersfield

BLS Asbestos successfully completed the removal of asbestos-containing materials at the David Brown Gears manufacturing site in Huddersfield to facilitate the refurbishment for a new wind turbine gear facility.

Asbestos Removal at Grade 1 Listed Building in West Yorkshire

BLS Asbestos Ltd successfully removed asbestos from the light wells of a Grade I listed building in West Yorkshire, enabling its renovation for future use while ensuring compliance with safety regulations.

Asbestos Removal from Hopwood Hall College, Rochdale

The case study details the successful asbestos removal project at Hopwood Hall College in Rochdale, which was essential for repairing flood-damaged areas and ensuring the safe reopening of the college's IT and childcare departments.

Asbestos Removal from Leeds City College’s Technology Campus

BLS Asbestos Ltd successfully completed the removal of asbestos from the basement of Leeds City College's Technology Campus on a tight deadline, ensuring minimal disruption to the college's operations.

Asbestos Removal at Leeds Demolition Site

BLS Asbestos successfully removed and disposed of various asbestos-containing materials from a disused property in Leeds, ensuring the site was safe for demolition and future regeneration.

Asbestos Removal at Leeds Junior School

BLS Asbestos successfully removed asbestos insulating board from Yeadon Westfield Junior School's caretaker's residence to facilitate the construction of a new classroom, ensuring safety during the process by scheduling the work over the Easter break.

Asbestos Removal at Major Construction Company in Warrington

BLS Asbestos Limited successfully removed and disposed of over 221 tonnes of asbestos from multiple premises for a major construction company in Warrington, contributing to a development project that will create 400 new jobs in the region.

Asbestos Removal from Nestle’s Halifax Site

The case study details the successful removal of asbestos from Nestle's Halifax office building to facilitate a security relocation project, emphasizing health and safety throughout the process.

Asbestos Removal for the Reserve Forces’ and Cadets’ Association

BLS Asbestos Ltd successfully removed asbestos-containing materials from the boiler room of the Territorial Army Centre in Scunthorpe, ensuring safe operations for maintenance.

Asbestos Removal for Southampton Retail Fit-Out

BLS Asbestos was instructed by Sports Direct to remove all asbestos containing materials from a former BHS site in Southampton.

Asbestos Removal from The Old Vinyl Factory in Hayes

BLS Asbestos was commissioned to remove asbestos containing pipe insulation from the sub-floor ducts within the Old Vinyl Factory.

Asbestos Removal Contract for West Yorkshire School

BLS Asbestos undertook asbestos removal work in the riser, boiler room and undercroft area of a West Yorkshire High School.