Menu
Get In Touch

Asbestos Surveys

BLS Asbestos have extensive experience in carrying out asbestos surveys all over the UK 

Get In Touch

Asbestos Management Surveys 

BLS Asbestos have extensive experience in carrying out asbestos surveys across the UK in a wide range of environments and can help your organisation to fulfil its legal obligations in relation to asbestos management, as well as preparing for any demolition or renovation projects where an asbestos survey may be a necessity. 

"BLS Asbestos provide a professional and quality service enabling Hanover to deal with issues arising from the management of asbestos in compliance with the Control of Asbestos Regulations 2006."

Asbestos Removal from Social Housing for Hanover Housing

Read our Case Studies

Why are asbestos surveys required before asbestos removal?

It can be very harmful to human health when breathing in asbestos fibres over an extended period of time (more about this can be read on the NHS website), which is the primary reason why asbestos containing materials were fully banned from use in the UK in 1999.

However, asbestos is commonly found in properties that were built or renovated before the year 2000.

If asbestos is left undisturbed then it is unlikely to pose any kind of threat, however some property owners like to have an asbestos survey carried out for the peace of mind of knowing that no asbestos containing materials are on their property, which eliminates any risk to the landlord or property manager.

An asbestos survey is designed to determine -

  1. The type of asbestos located within the property (if any), which will be assessed at a UKAS accredited laboratory.
  2. The location and volume of all asbestos containing material (ACM) within the property.
  3. The condition of the ACM materials.

The landowner will then be provided with a report of our findings and next steps recommended if required.

What happens after the asbestos survey?

If the material sampled within the surveyed property is determined to be ACM, then we will recommend that we plan an asbestos removal project around the needs of your project or business. The key aims of this plan are designed to ensure that we create as minimal disruption as possible, whilst also being able to safely and securely remove or encapsulate the asbestos.

We work within the confines of The Control of Asbestos Regulations 2012 and have numerous qualifications displaying our expertise and ability to operate legally within the UK.

BLS Asbestos has significant experience of providing asbestos surveys and work across multiple sectors, such as

  • Demolition and refurbishment projects
  • Commercial properties
  • Schools and colleges
  • Retail premises
  • Factories and warehouses
  • Chemical plants
  • Public sector buildings
  • Prisons

Get in contact with us now if you would like an asbestos survey to be conducted to determine if you have asbestos containing materials in or around your property.

An Asbestos Survey Case Study

Asbestos Survey & Removal for the Reserve Forces’ and Cadets’ Association in Scunthorpe

BLS Asbestos Ltd was commissioned to remove various amounts of asbestos containing insulation materials from the boiler room of the Territorial Army Centre, Scunthorpe.

Historical asbestos insulation residues in the walls, floors and ceiling had been highlighted after a survey.

"A great pilot project completed on time, the staff were a pleasure to work with."

Read more about this case study here

Case Studies

Asbestos Removal for David Brown Gears in Huddersfield

BLS Asbestos successfully completed the removal of asbestos-containing materials at the David Brown Gears manufacturing site in Huddersfield to facilitate the refurbishment for a new wind turbine gear facility.

Asbestos Removal at Grade 1 Listed Building in West Yorkshire

BLS Asbestos Ltd successfully removed asbestos from the light wells of a Grade I listed building in West Yorkshire, enabling its renovation for future use while ensuring compliance with safety regulations.

Asbestos Removal from Hopwood Hall College, Rochdale

The case study details the successful asbestos removal project at Hopwood Hall College in Rochdale, which was essential for repairing flood-damaged areas and ensuring the safe reopening of the college's IT and childcare departments.

Asbestos Removal from Leeds City College’s Technology Campus

BLS Asbestos Ltd successfully completed the removal of asbestos from the basement of Leeds City College's Technology Campus on a tight deadline, ensuring minimal disruption to the college's operations.

Asbestos Removal at Leeds Demolition Site

BLS Asbestos successfully removed and disposed of various asbestos-containing materials from a disused property in Leeds, ensuring the site was safe for demolition and future regeneration.

Asbestos Removal at Leeds Junior School

BLS Asbestos successfully removed asbestos insulating board from Yeadon Westfield Junior School's caretaker's residence to facilitate the construction of a new classroom, ensuring safety during the process by scheduling the work over the Easter break.

Asbestos Removal at Major Construction Company in Warrington

BLS Asbestos Limited successfully removed and disposed of over 221 tonnes of asbestos from multiple premises for a major construction company in Warrington, contributing to a development project that will create 400 new jobs in the region.

Asbestos Removal from Nestle’s Halifax Site

The case study details the successful removal of asbestos from Nestle's Halifax office building to facilitate a security relocation project, emphasizing health and safety throughout the process.

Asbestos Removal for the Reserve Forces’ and Cadets’ Association

BLS Asbestos Ltd successfully removed asbestos-containing materials from the boiler room of the Territorial Army Centre in Scunthorpe, ensuring safe operations for maintenance.

Asbestos Removal for Southampton Retail Fit-Out

BLS Asbestos was instructed by Sports Direct to remove all asbestos containing materials from a former BHS site in Southampton.

Asbestos Removal from The Old Vinyl Factory in Hayes

BLS Asbestos was commissioned to remove asbestos containing pipe insulation from the sub-floor ducts within the Old Vinyl Factory.

Asbestos Removal Contract for West Yorkshire School

BLS Asbestos undertook asbestos removal work in the riser, boiler room and undercroft area of a West Yorkshire High School.